WARREN LANE Word Play Camp: July 8-12 Grade 4
WARREN LANE Word Play Camp: July 8-12 Grade 4 I want to go to The Cabin because I want to and because I want to be a better writer. My grand parents are living in Guatemala and I write them letters.
WARREN LANE Word Play Camp: July 8-12 Grade 4 I want to go to The Cabin because I want to and because I want to be a better writer. My grand parents are living in Guatemala and I write them letters.
CLAIRE LANE Cabin Writers Camp: July 8-12 Grade 5 Why I want to do writing camp is because I like to read and I want to write my own chapter book. Writing is like you can make up your own world and you can go back into time.
Pictured is Rob Woodward, Field Supervisor, with his crew. Note: Like all field craft personnel, Rob and his crew have been working hard under extreme heat conditions. We love these guys. Rob has been very helpful to “Action”. We wish the newspapers, radio and television stations would take some time to showcase the work being […]
In Stephan’s own words: “My experience at the BSU summer chamber music camp was awesome! I learned so much about not only how my instrument works but how it works together with other instruments. It was definitely worth it and I appreciate all the faculty and workers that helped run this camp. I am especially […]
In Gabriel’s own words: “The Boise State University Summer Chamber Music Camp was both an excellent learning experience and a good deal of fun. Over the nine hour day I attended seven classes: fundamental skills, music theory, music history, chamber ensembles, choir, master class, and a piano workshop. In each class I learned new and […]
Pictured (l – r): Tony Inserra, Superintendent, Tyler Crofts, and Jake Wills McAlvain Group of Companies Inc., an iYERP partner – Platinum Level, is the general contractor. iYERP is partnering with McAlvain on several other projects throughout the Treasure Valley including JUMP
Pictured is Rich Clausen who was rigging some of the deck shoring equipment and communicating with the operator of the tall tower crane. Note: The scope of McAlvain work is very complex and challenging. They are responsible for all concrete work casting and placing. Brian Murphy is McAlvain project superintendent. We have worked with Brian […]
Pictured (l – r): Nels Nelson, Vice President-Operations; Don Perkins, Project Manager; Carl Benjamin, Superintendent; Neil Nelson, President and Korey Hall, Project Engineer. Client: St. Luke’s Developer: Gardner Company Architect & Engineer: CTA General Contractor: Engineered Structures Inc. (ESI)
Pictured (l – r) Lindsay Erb, CTA Architects & Engineers and Michelle Warwick, Regional Rep, Western States (The CAT Rental Store). Note: Photo was taken at a barbecue for project workers which was hosted by Western States, the local Caterpillar distributor. Lindsay was making a site visit at St. Luke’s Ambulatory Surgery Center Project in […]
Pictured (l – r): Carmen Hendrichs, Assistant Project Manager and Cheralee Keyes, Project Coordinator. Note: Carmen and Cheralee are part of the ESI Project Team working on the Scentsy Campus North Office Tower Project in Meridian.